07.09.09 Progress shot...backfilled & ready for the deck & framing!
07.08.09 Progress shot...foundation drainage finished & ready to be backfilled.
07.07.09 Progress shot...more drainage and detail-work.
07.06.09 Progress shot...installing waterproofing, drain pipes for downspouts & foundation drains.
07.03.09 Progress shot...foundation poured & forms stripped from foundation.
07.02.09 Progress shot...freshly poured basement walls with forms still intact!